LADU
Governed by City of Los Angeles

ADU Rules in San Pedro.

Local ADU regulations, permit fees, setback requirements, and typical timelines for San Pedro (City of Los Angeles). Last updated 2026-05-27.

At a Glance

San Pedro ADU Requirements

Setbacks (Side / Rear)
4 ft / 4 ft
Max Height (Detached)
16 ft

Attached ADU: up to 25 ft

Max Size (Detached / JADU)
1,200 / 500 sq ft
Parking Required?
No
Est. Permit Fees
$10k–$20k
Total Project Timeline
~12 months

Design 4 weeks · Permit 8 weeks · Build 38 weeks

Plain-language summary

In San Pedro (governed by the City of Los Angeles), a detached ADU requires a minimum 4-foot side setback and 4-foot rear setback. The maximum height for a detached ADU is 16 feet, while an attached ADU may be up to 25 feet. The maximum size for a detached ADU is 1,200 sq ft; a Junior ADU (JADU) is limited to 500 sq ft. Replacement parking is not required for most projects. Typical permit fees range from $10,000 to $20,000. A typical project takes approximately ~12 months from design start to move-in, including 4 weeks of design, 8 weeks for permit review, and 38 weeks of construction.

⚠️ ADU rules change frequently. Always verify current requirements with the City of Los Angeles Building & Safety Department before submitting plans. Official source →

San Pedro-Specific Rules

What to Watch Out For

  • San Pedro is a neighborhood within the City of Los Angeles — all LADBS rules apply.
  • Coastal Zone applies to bluff-top and waterfront properties; Coastal Development Permit required.
  • Port-adjacent industrial areas: confirm residential zoning before designing.
  • San Pedro Community Plan area has specific design guidelines for new residential construction.
Typical Process

How Long Does It Take to Get an ADU Permit in San Pedro?

Design
4 weeks

Site study, floor plans, elevations, structural drawings.

Permit Review
8 weeks

Plan check, corrections, and permit issuance by City of Los Angeles Building & Safety.

Construction
38 weeks

Foundation, framing, MEP rough-in, finishes, final inspection.

Book your site visit

A licensed engineer on your lot, free.

30 minutes. We walk the property, figure out what's feasible, and answer any questions you have.

Next available — LA County

We're booking out further than usual. Click Book my free visit to see all available times.