ADU Rules in Pacific Palisades.

Local ADU regulations, permit fees, setback requirements, and typical timelines for Pacific Palisades (City of Los Angeles). Last updated 2026-05-27.

At a Glance

Pacific Palisades ADU Requirements

Setbacks (Side / Rear)
4 ft / 4 ft
Max Height (Detached)
16 ft

Attached ADU: up to 25 ft

Max Size (Detached / JADU)
1,200 / 500 sq ft
Parking Required?
No
Est. Permit Fees
$10k–$28k

Coastal Zone properties add a Coastal Development Permit fee.

Total Project Timeline
~13 months

Design 5 weeks · Permit 10 weeks · Build 42 weeks

Plain-language summary

In Pacific Palisades (governed by the City of Los Angeles), a detached ADU requires a minimum 4-foot side setback and 4-foot rear setback. The maximum height for a detached ADU is 16 feet, while an attached ADU may be up to 25 feet. The maximum size for a detached ADU is 1,200 sq ft; a Junior ADU (JADU) is limited to 500 sq ft. Replacement parking is not required for most projects. Typical permit fees range from $10,000 to $28,000. A typical project takes approximately ~13 months from design start to move-in, including 5 weeks of design, 10 weeks for permit review, and 42 weeks of construction.

⚠️ ADU rules change frequently. Always verify current requirements with the City of Los Angeles Building & Safety Department before submitting plans. Official source →

Pacific Palisades-Specific Rules

What to Watch Out For

  • Pacific Palisades is within the City of Los Angeles — LADBS rules apply.
  • Large portions of the Palisades are in the Coastal Zone — a Coastal Development Permit (CDP) may be required.
  • Entire community is designated VHFHSZ — Class A roofing, ember-resistant vents, and 100-ft defensible space are mandatory.
  • Post-Palisades Fire (Jan 2025): many parcels are in the fire rebuild zone — expedited review pathways may be available under emergency ordinances.
Typical Process

How Long Does It Take to Get an ADU Permit in Pacific Palisades?

Design
5 weeks

Site study, floor plans, elevations, structural drawings.

Permit Review
10 weeks

Plan check, corrections, and permit issuance by City of Los Angeles Building & Safety.

Construction
42 weeks

Foundation, framing, MEP rough-in, finishes, final inspection.

Book your site visit

A licensed engineer on your lot, free.

30 minutes. We walk the property, figure out what's feasible, and answer any questions you have.

Next available — LA County

We're booking out further than usual. Click Book my free visit to see all available times.