LADU
Los Angeles County · CA

ADU Rules in Calabasas.

Local ADU regulations, permit fees, setback requirements, and typical timelines for Calabasas. Last updated 2026-05-27.

At a Glance

Calabasas ADU Requirements

Setbacks (Side / Rear)
4 ft / 4 ft
Max Height (Detached)
16 ft

Attached ADU: up to 25 ft

Max Size (Detached / JADU)
1,200 / 500 sq ft
Parking Required?
Yes

Calabasas is not near major transit; replacement parking generally required for conversions.

Est. Permit Fees
$8k–$16k

Las Virgenes Municipal Water District (LVMD) connection fees may apply.

Total Project Timeline
~12 months

Design 5 weeks · Permit 7 weeks · Build 38 weeks

Plain-language summary

In Calabasas, a detached ADU requires a minimum 4-foot side setback and 4-foot rear setback. The maximum height for a detached ADU is 16 feet, while an attached ADU may be up to 25 feet. The maximum size for a detached ADU is 1,200 sq ft; a Junior ADU (JADU) is limited to 500 sq ft. Replacement parking is required for most projects. Typical permit fees range from $8,000 to $16,000. A typical project takes approximately ~12 months from design start to move-in, including 5 weeks of design, 7 weeks for permit review, and 38 weeks of construction.

⚠️ ADU rules change frequently. Always verify current requirements with the Calabasas Building & Safety Department before submitting plans. Official source →

Calabasas-Specific Rules

What to Watch Out For

  • Las Virgenes Municipal Water District (LVMD) requirements: fire-resistive landscaping and defensible space required.
  • HOAs are very common in Calabasas — review CC&Rs and obtain HOA approval before permitting.
  • Calabasas Municipal Code has additional open space preservation requirements for hillside lots.
  • VHFHSZ designation applies to much of the city; fire-resistant construction required.
Typical Process

How Long Does It Take to Get an ADU Permit in Calabasas?

Design
5 weeks

Site study, floor plans, elevations, structural drawings.

Permit Review
7 weeks

Plan check, corrections, and permit issuance by Calabasas Building & Safety.

Construction
38 weeks

Foundation, framing, MEP rough-in, finishes, final inspection.

Book your site visit

A licensed engineer on your lot, free.

30 minutes. We walk the property, figure out what's feasible, and answer any questions you have.

Next available — LA County

We're booking out further than usual. Click Book my free visit to see all available times.