LADU logo

Build Your ADU Faster and For Less

Factory-built modular ADUs that save you time and money.

Modern modular ADU exterior

Shipping in 2026

Be among the first to get a modular ADU from LADU. Reserve your spot today.

Modular ADUs from LADU

Why Go Modular?

Traditional ADU construction can take months and cost a fortune. Our modular ADUs change everything. By manufacturing components in a controlled factory environment, we deliver a better product in less time—and at a significantly lower cost.

Benefits of choosing a modular ADU:

  • Faster construction — Factory manufacturing means your ADU is built in weeks, not months. Site work happens simultaneously, so you're not waiting around.
  • Lower cost — Efficient factory production, bulk materials, and reduced labor time translate to significant savings compared to traditional stick-built construction.
  • Consistent quality — Built indoors, protected from weather delays and damage, with rigorous quality control at every step.

How It Works

Our modular ADU process is designed to be simple and stress-free. Here's how we bring your ADU from concept to completion:

1. Factory Manufacturing

Your ADU components are precision-built at our partner's manufacturing facility. This controlled environment ensures consistent quality while dramatically reducing build time.

2. Delivery to Your Site

Once manufacturing is complete, the modular components are transported directly to your property, ready for assembly.

3. Professional Assembly

A licensed contractor assembles the components on-site, connects utilities, and completes all finishing work. The result? A beautiful, fully-functional ADU in a fraction of the time.

Livable Floor Plans

All floor plans are designed to be livable and functional, with a focus on space efficiency and natural light.

Modular ADU Floor Plan Option 1

Floor Plan 1

Modular ADU Floor Plan Option 2

Floor Plan 2

Make It Your Own

Just because it's modular doesn't mean it's cookie-cutter. We offer customization options so your ADU reflects your style and meets your needs:

  • Fixtures — Choose from a curated selection of faucets, lighting, and hardware.
  • Appliances — Select the kitchen and laundry appliances that fit your lifestyle.
  • Exterior finishes — Pick colors, siding materials, and details that complement your main home.

Related Services

Frequently Asked Questions

How much cheaper is a modular ADU compared to traditional construction?

Modular ADUs typically cost significantly less than traditional stick-built ADUs due to factory efficiencies, reduced labor costs, and faster timelines. Contact us for specific pricing details.

How long does it take to build a modular ADU?

While traditional ADU construction can take 6-12 months, modular ADUs can be manufactured and assembled in a fraction of that time. The exact timeline depends on your site preparation and permit approval.

Do modular ADUs require permits?

Yes, modular ADUs require the same permits as traditional ADUs. The good news? LADU handles all permitting for you as part of our full-service offering.

Can I customize the floor plan?

We offer select floor plan configurations optimized for efficiency and livability. Within those plans, you can customize fixtures, appliances, and exterior finishes to suit your preferences.

When will modular ADUs be available?

We're shipping our first modular ADUs in 2026. Join the waiting list today to reserve your spot and be among the first to benefit from this game-changing approach to ADU construction.

Ready to Build Smarter?

Join the waiting list today and get:

  • Early access to modular ADU availability.
  • Priority scheduling when production begins.
  • Exclusive updates on designs and pricing.
  • A faster, more affordable path to your ADU.